Jump to content


Welcome to DBSTalk


Sign In 

Create Account
Welcome to DBSTalk. Our community covers all aspects of video delivery solutions including: Direct Broadcast Satellite (DBS), Cable Television, and Internet Protocol Television (IPTV). We also have forums to discuss popular television programs, home theater equipment, and internet streaming service providers. Members of our community include experts who can help you solve technical problems, industry professionals, company representatives, and novices who are here to learn.

Like most online communities you must register to view or post in our community. Sign-up is a free and simple process that requires minimal information. Be a part of our community by signing in or creating an account. The Digital Bit Stream starts here!
  • Reply to existing topics or start a discussion of your own
  • Subscribe to topics and forums and get email updates
  • Send private personal messages (PM) to other forum members
  • Customize your profile page and make new friends
 
Guest Message by DevFuse

Photo

E*/Dish Network 30-day compliance report (summary)


  • This topic is locked This topic is locked
6 replies to this topic

#1 OFFLINE   Mark Holtz

Mark Holtz

    Day Sleeper

  • DBSTalk Club
  • 9,873 posts
  • LocationSacramento, CA
Joined: Mar 23, 2002

Posted 14 May 2002 - 12:44 AM

Okay, I received a copy of the 30 day compliance report from EchoStar Communications, along with a petition for reconsideration. This was a result of the FCC ruling on April 4th about second dishes for receiving locals. If you are searching the FCC archives, it is docket 00-96, in response to order DA 02-765, with a code of CSR-5865-Z. When I checked Sunday night, it wasn't up on the web site.

So here goes. The filing is written by lawyers who tend to take something that can be explained in two lines into two pages. I will follow the format that was laid out.

I. SUMMARY
A. Compliance Team Assembled After the April 4th ruling, a meeting was held at E* consisting of the senior technology, marketing, and legal executives to develop a compliance plan. The compliance process began on April 6th.
B. Status of Local-Into-Local Markets as of May 3rd E* offers local-in-local in 36 markets. Five of these markets are currently served by the single dish solution, while the rest have one or more stations on side satellites. (A footnote says that Philadelphia stations are being served by 129 satellite.) As of May 3rd, E* was reveiewing data from in-orbit testing of E*7.
C. Status of Installations and Timetables As of the filing, there were 12,942 requests for a second dish, with 11,841 installations completed. The average turnaround was 8.1 days, however a footnote says that two-thirds of the installs were completed less than eight days, and fifty percent of the installs were completed in less than four days. One puzzling thing: "There is an average of 1.7 days from the original scheduled date to the date the work order is completed."

II. COMPLIANCE PLAN SPECIFICS
A. Comsumer Education Echostar is proceeding with several initiatives to educate the consumer. This include:
a. Letter to all existing customers This is a letter that we all received at the beginning of the month. There are two versions of this letter: One for most of the markets (Exhibit 1 had a sample letter for the Denver market), and one for the Philadelphia market (Exhibit 2). The Philadelphia letter includes note about equipment replacement.
b. CSR Education CSRs have been trained and clarified on the second dish, and scripts have been rewritten/
c. Changes to advertising materials Advertising materials have been altered to better clarify the locals. The following paragraph now part of the materials: "Channels may vary by market. Some channels may require the installation of a second dish antenna free of any charges at the time of your original installation. Local Broadcast Networks by satellite are only available to customers who reside in the specified local Designated Market Area (DMA). Cities subject to change without notice and customers may be eligible for only one city package." Exhibit 3 had a copy of the brochure.
d. Training of and Materials for Installers and Retailers Self-explanatory. New materials being provided.
e. Website The website has been modified so that i) In each market, all local stations are listed on the same page, ii) The websites states that a second dish is required, and lists the stations which require the second dish, and how to get the dish, and iii) Lists the stations with call letters, affiliation, logo (when clearance is obtained), and eventually a description of the channel. A sample was enclosed in the form of Exhibit 4.
f. Other publicity A FYI spot has been produced to inform the customers. This spot would run with the same frequency as any other spot, and will run approximately 1,500 times per week (on a total of 77 networks). Exhibit 5 contained a copy of the FYI script.
B.Continguous Channel Placement and Listing on Electronic programming guides The FCC ruled that Echostar violated the contiguous channel requirement by not listing the stations available on the side satellites if the second dish wasn't installed. Echostar is working on upgrading the firmware on the receivers so that all local stations for a local-in-local market will be listed in the guide, and if a customer selects a station which requires a second dish, they will get a display informing that a second dish is required. This is a major effort, and they are starting with the 301s and 501s, then working their way down the models based upon popularity. This is a in-progress project. Because of the scale, E* expects full deployment by July 31st.

III. CONCLUSION E* doesn't believe that it violated the law. If E* isn't permitted to complete the compliance plan as set forth, the only alternative would be to shut down local-in-local service until all subscribers were converted. Not only would it be contrary to public interest, but would violate the April 4th order which specifically indicated that "the action taken here is intended to address the violations without resulting in a loss of service to any existing subscribers." In addition, E* believes that it had no notice prior to April 4th that additional steps would be needed.
-----------------
WHEW! The actual order is 15 pages long, not counting cover sheet or exhibits. Remember, this is issued by Echostar/Dish Network, and I don't work for them, just a subscriber. All typos are mine. No doubt that there will be a significant change in average turnaround time especially due to a shortage of dishes that are being reported by forum members.
"In many ways, this opera does fulfil my often quoted description of what most operas is about. The tenor is trying to sleep with the soprano, and the baritone is trying to stop them." - Sean Bianco, KXPR At The Opera
Check out my list of links.

...Ads Help To Support This SIte...

#2 OFFLINE   lee635

lee635

    Hall Of Fame

  • Registered
  • 2,013 posts
Joined: Apr 17, 2002

Posted 14 May 2002 - 10:36 AM

Great summary!!
An eye for an eye makes the whole world blind. - Ghandi

#3 OFFLINE   Mark Holtz

Mark Holtz

    Day Sleeper

  • Topic Starter
  • DBSTalk Club
  • 9,873 posts
  • LocationSacramento, CA
Joined: Mar 23, 2002

Posted 14 May 2002 - 11:47 AM

Thanks!
"In many ways, this opera does fulfil my often quoted description of what most operas is about. The tenor is trying to sleep with the soprano, and the baritone is trying to stop them." - Sean Bianco, KXPR At The Opera
Check out my list of links.

#4 OFFLINE   bryan27

bryan27

    DBSTalk E* Spot Beam Guru

  • Registered
  • 443 posts
Joined: Apr 01, 2002

Posted 15 May 2002 - 07:07 AM

Perhaps, we should change your title to LIL Compliance King :)

Has the report been placed on-line yet? Sometimes finding something at the FCC isn't easy.

#5 OFFLINE   Mark Holtz

Mark Holtz

    Day Sleeper

  • Topic Starter
  • DBSTalk Club
  • 9,873 posts
  • LocationSacramento, CA
Joined: Mar 23, 2002

Posted 15 May 2002 - 08:00 AM

I haven't looked since Sunday. I'm still surprised that I'm on the mailing list in paper form. At the end of the filing, they list all of the addresses that they mailed (or, for the FCC, hand delivered) to. You see all thse commissioners, counsels, broadcasters, and me. Go figure. All I know is that I submitted a letter on-line to the FCC's web site.
"In many ways, this opera does fulfil my often quoted description of what most operas is about. The tenor is trying to sleep with the soprano, and the baritone is trying to stop them." - Sean Bianco, KXPR At The Opera
Check out my list of links.

#6 OFFLINE   Mark Holtz

Mark Holtz

    Day Sleeper

  • Topic Starter
  • DBSTalk Club
  • 9,873 posts
  • LocationSacramento, CA
Joined: Mar 23, 2002

Posted 14 July 2002 - 06:33 PM

(bump)
"In many ways, this opera does fulfil my often quoted description of what most operas is about. The tenor is trying to sleep with the soprano, and the baritone is trying to stop them." - Sean Bianco, KXPR At The Opera
Check out my list of links.

#7 OFFLINE   Richard King

Richard King

    Hall Of Fame

  • Registered
  • 21,331 posts
Joined: Mar 25, 2002

Posted 14 July 2002 - 07:08 PM

You see all thse commissioners, counsels, broadcasters, and me.

We have a big wig among us. :D
The Pump Don't Work 'cause the Vandals Took the Handles.




Protected By... spam firewall...And...