When I ordered my HR-20, I was given an installation date of 1/3. When I called back a week later to confirm and possibly change the date, I was told that the order was never promissed and the next available date was 2/7. Obviously, I was very unhappy.
The CSR conferenced me in with the local installation company, but the best he could do at the time was put me on a wait list for earlier installation.
Is there anything else I can do to move up this installation date? I already have service and all of my cables run to an existing SD DirecTivo box.
Thanks.
The CSR conferenced me in with the local installation company, but the best he could do at the time was put me on a wait list for earlier installation.
Is there anything else I can do to move up this installation date? I already have service and all of my cables run to an existing SD DirecTivo box.
Thanks.